Freeport-McMoRan was worth about $100 billion a month ago. By the afternoon of November 18 it was down to roughly $74 billion, on the day copper gave back its entire 2026 gain. Gold hit a 14-month low the next day, and the TSX logged its longest losing streak since December 2024. A Brazilian explorer picked Monday to report 11.75% copper anyway.
Prospectiva Hits 10.02 Metres of 11.75% Copper at São Francisco
Prospectiva Resources Ltd. (TSXV: PSVA) reported on November 23 that hole SF_26_006 returned 10.02 metres grading 11.75% copper, 0.87 g/t gold and 1.09% zinc from 104.98 metres downhole at its São Francisco copper-gold project in Pernambuco, Brazil. Best hole on the property so far. It steps out about 60 metres northeast of SF_26_003, which opened the company’s maiden program in October with 7.15 metres at 4.78% copper.
Grade like that usually comes from massive sulfide, and that is what the core shows: massive to semi-massive chalcopyrite and pyrrhotite. Prospectiva interprets São Francisco as a deformed volcanogenic massive sulfide (VMS) system, a deposit type formed by hydrothermal vents on an ancient seafloor. Yamana Gold first found it in 2019.
No resource estimate exists yet. The company is aiming for an initial one in 2027. True widths are unknown. Holes 007 to 009 are drilled and waiting on assays, and 010 and 011 are underway.
The same release disclosed an automated market-making agreement with ICP Securities at C$7,500 a month, subject to TSXV acceptance. It is unrelated to this publication. Prospectiva is a micro-cap with no US OTC listing, so US investors should check with their broker on access.
Phoenix Metals Cuts 169 Metres of 1.30% CuEq at Historic Lexington, BC
Phoenix Metals Corp. (TSX: PCA) released the first nine holes from its Lexington target near Grand Forks, British Columbia, on November 18. LXDDH-26-001 returned 169 metres at 1.30% copper equivalent from 41 metres, built from 1.02 g/t gold, 0.22% copper and 3.79 g/t silver, with a 38-metre interval at 3.66% CuEq inside it. LXDDH-26-008 added 233.5 metres at 0.41% CuEq from 8.5 metres.
Break the equivalent grade apart and it is mostly gold. Using the company’s own prices and recoveries, gold supplies roughly four-fifths of that 1.30%, by aktiego.com’s calculation.
That price deck is the catch. Phoenix uses US$4,000 gold and US$6.00 copper. Gold fell to US$3,627 on November 19, and Comex copper dropped to about US$5.58 a pound on November 18. The 85% copper and 90% gold recoveries come from the company’s current Mineral Resource Estimate by P&E Mining Consultants. The 60% silver recovery is an assumption with no testwork behind it.
Investors noticed. Shares fell 12% to 93 cents on Wednesday morning, their lowest since the July IPO, leaving a market value near C$84 million. Phoenix is pitching Lexington as a bulk-tonnage open-pit target over 1.5 km of strike, and that target has no resource estimate. The P&E estimate the company cites relates to Lexington’s historic high-grade underground zones. True widths are not determined.
More Lexington assays (11 holes remain) and first Phoenix South results are expected in December, with the rest running into Q1 2027. No US OTC listing exists.
Aurania Hits 10.10 g/t Gold Over 4.15 Metres in Iceland
Aurania Resources Ltd. (TSXV: ARU; OTCQB: AUIAF) is drilling for gold about 20 km east of Reykjavík. Its first assays from the Thormódsdalur project, released November 16, put TARU2026-05 at 10.10 g/t gold over 4.15 metres from 20.85 metres downhole, including 15.31 g/t over 2.40 metres. TARU2026-04 returned 3.13 g/t over 2.50 metres and 2.05 g/t over 4.30 metres.
Both were twin holes, drilled beside historical holes to check old results. The bigger fix is core recovery: 98% this year, against roughly 50% or less historically, when much of the clay-rich fault material was lost.
TARU2026-03 matters most. It twins a historical intercept reported at 415 g/t gold, a number Aurania’s Qualified Person has not verified and that may not repeat. Assays for it and five other holes are pending, with no date given.
No resource estimate or technical study exists. Aurania holds the project through an April 2026 option agreement with St-Georges Eco-Mining and its subsidiary Iceland Resources. Third-party financial data shows the company’s total liabilities well above its total assets.
Frequently Asked Questions
Unknown until assays return; no date has been given. The company plans more eastward step-outs along the interpreted down-plunge extension, with holes 010 and 011 due to finish in Q4 2026.
The equivalent figure uses US$4,000 gold and US$6.00 copper, both above where the metals traded during the selloff, so it would be lower at current prices. The individual grades (1.02 g/t gold, 0.22% copper) do not change. More Lexington assays and first Phoenix South results are expected in December.
There is no way to know yet. The historical figure is unverified by Aurania’s Qualified Person, and assays for TARU2026-03 are pending with no date.
No. Prospectiva is targeting an initial resource at São Francisco in 2027. Phoenix cites a P&E estimate tied to Lexington’s historic underground zones, but its open-pit target has none. Aurania has no resource at Thormódsdalur.
Sources
- GlobeNewswire: Prospectiva Reports High-Grade Copper Drill Intersection at São Francisco: 10.02 m at 11.75% Cu, November 23 2026
- Stockhouse / GlobeNewswire: Prospectiva Intersects Near-Surface High-Grade Copper at São Francisco: 7.15 m at 4.78% Cu, October 20 2026
- BNN Bloomberg / GlobeNewswire: Prospectiva Resources Begins Trading on the TSX Venture Exchange, August 14 2026
- GlobeNewswire: Phoenix Metals Intersects 169 metres at 1.30% CuEq in the First Drill Results from Lexington, November 18 2026
- The Northern Miner: Phoenix hits broad gold and copper at old BC mine, November 18 2026
- Newsfile via Mining Stock Education: Aurania Intersects 10.10 g/t Gold over 4.15 Metres in Initial Drill Results from the Thormodsdalur Gold Project in Iceland, November 16 2026
- Mining Technology: Aurania finishes drilling at Thormodsdalur site
- Simply Wall St: Aurania Resources balance sheet health
- IMA / MINING.COM: Copper price craters as AI, tariff trades unwind, November 18 2026
- Reuters via Kitco: TSX posts longest daily losing streak since 2024 as gold selloff deepens, November 19 2026
- Mining.com.au: TSX closes at six-month low as gold and miners tumble, November 2026
Editorial Disclosure
Securities discussed: Prospectiva Resources Ltd. (TSXV: PSVA), Phoenix Metals Corp. (TSX: PCA), and Aurania Resources Ltd. (TSXV: ARU; OTCQB: AUIAF). aktiego.com has not received any compensation from any company mentioned, their management, investor relations representatives, or any third party. No staff member or principal of aktiego.com holds a position in any security mentioned at the time of publication. Press release dates and sources verified: Prospectiva, GlobeNewswire, November 23, 2026; Phoenix Metals, GlobeNewswire, November 18, 2026; Aurania, Newsfile, November 16, 2026. All drill intervals are downhole lengths; true widths are not known for any company covered. NI 43-101 (National Instrument 43-101, Canada’s disclosure standard for mineral projects): no resource estimate exists at Prospectiva’s São Francisco or Aurania’s Thormódsdalur. Phoenix Metals cites a P&E Mining Consultants Mineral Resource Estimate effective December 31, 2025; its Lexington bulk-tonnage open-pit target has no resource estimate. Phoenix Metals’ CuEq uses US$6.00/lb copper, US$4,000/oz gold and US$50/oz silver, with 85% copper and 90% gold recoveries taken from its resource estimate and a 60% silver recovery assumed without testwork. Gold and copper traded below these assumptions during the coverage window. Prospectiva disclosed an automated market-making agreement with ICP Securities Inc. at C$7,500 per month, subject to TSXV acceptance; this arrangement is unrelated to aktiego.com’s coverage. Prospectiva is a micro-cap security with elevated volatility and thin liquidity. Prospectiva and Phoenix Metals have no US OTC listing; US investors should check with their broker. Aurania’s historical 415 g/t gold intercept has not been verified by the company’s Qualified Person. Third-party financial data indicates Aurania’s total liabilities exceed its total assets. Projects in Brazil and Iceland carry jurisdiction and permitting risk. Forward-looking commentary is opinion only. Small cap and micro-cap stocks listed on the CSE, TSX, TSXV, and Nasdaq are speculative investments carrying significant risk including potential total loss of capital. Coverage on aktiego.com is provided for informational and educational purposes only. aktiego.com is not a registered investment advisor. Nothing in this article constitutes financial, investment, or professional advice. Readers are encouraged to conduct their own due diligence and consult a qualified financial advisor before making any investment decisions. For more information please see our full DISCLAIMER.











